It has been a long 2 months for me. I have constantly had to deal with loud noises, banging, weird smells, stuff everywhere, and if that weren't enough, I also had guys downstairs in the basement doing similar stuff. We started towards the end of March and this week they finished the painting. It's exciting to see it all coming together. Next week they are doing the tile work, then it will be 1 week of finishing touches and carpet. Here are pictures of the basement up to Monday of this week.
Step 1: Framing
a) half media room/half bedroom b) hallway/media room/bedroom/bathroom c)bedroom d)rec room
Step 2: French Door and Big Window
a) rec room b)bedroom window
Step 2.5: (plumbing, electrical, wiring, and insulation)
a) bathroom plumbing
Step 3: Dry wall
a) rec room towards stairs b) rec room towards door
Step 4: Shelves and Priming
a) media room shelves b) bedroom c) rec room towards stairs d) bathroom looking at shelves and door to bedroom e) closet in bedroom
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment